A grain elevator at Namao in Sturgeon County, Alberta
ExplainerAI & Data Centres

How an Alberta data centre actually gets approved, and where the public gets a say

Four regulators, one municipality and a water licence. Only one of those steps has a public hearing, and it is not the one people are shouting about.

A plain walkthrough of every approval a data centre needs in Alberta, who decides each one, how long it takes, and the single point in the process where a resident has standing.

Read it →Last reviewed 2026-08-21

Downtown Fort McMurray in the Regional Municipality of Wood Buffalo
AnalysisAI & Data Centres

Why Fort McMurray is a serious data centre proposition, and the four questions it still has to answer

Wood Buffalo has three gigawatts of in-region generation, 1,631 shovel-ready acres and the coolest summers of any major North American city. The pitch is stronger than most people outside the region realise.

The Regional Municipality of Wood Buffalo is making a data centre case built on power, climate and an unusually credentialed workforce. It is a good case. Here is what is genuinely strong about it, and what a prospective operator will want answered before signing.

Read it →Last reviewed 2026-08-20

A high-voltage transmission tower against open sky near Lethbridge, Alberta
ExplainerEnergy

How Alberta’s electricity market actually works

Alberta runs the only energy-only deregulated power market in Canada. Almost every technology story in the province eventually runs into it.

A plain explanation of Alberta’s power market: who builds generation, how prices are set, what the AESO does and does not control, and why data centres have to negotiate with it.

Read it →Last reviewed 2026-08-19

The downtown Calgary skyline at sunset, seen across the grassland of Nose Hill Park
GuideStartups

How technology companies actually get funded in Alberta

A practical map of the programmes, agencies and capital sources, and an honest account of where the gaps are.

Grants, tax credits, accelerators, seed funds and the later-stage gap: what exists in Alberta, what each is genuinely for, and what founders consistently get wrong about the sequence.

Read it →Last reviewed 2026-08-19

Rows of densely cabled server racks inside a data centre hall
ReferenceAI & Data Centres

The Alberta data centre buildout, term by term

Interconnection queue, firm DTS, bring-your-own-generation, PUE, colocation, anchor tenant: what the vocabulary means and why each term matters.

A reference glossary for reading coverage of Alberta’s AI data centre buildout, with the distinctions that separate a real project from an announcement.

Read it →Last reviewed 2026-08-19