Skip to content
NorthwardAB: Tech News, Alberta Focus
HomeNewsInsightsStartupsJobsMarketsResourcesAboutContact
⌕
Byline archive

L. Trembath

Articles published under this NorthwardAB byline.

Our editorial standards

Natural-colour satellite view of the proposed Wonder Valley area, with roads, forest clearings and a river valley to the east.Energy Tech
Alberta · 2026-11-22

Wonder Valley’s federal review fight is about more than the power plants

Sturgeon Lake Cree Nation seeks a federal assessment of Alberta’s Wonder Valley AI data centre. What the gas-plant rule repeal and Smoky River licence actually mean.

Three voltage regulators mounted on a steel platform between two wooden utility poles.Policy & Resources
Alberta · 2026-11-22

Alberta reviews how utilities tell customers about local franchise fees

The Alberta Utilities Commission’s Rule 029 review would spell out notice and application requirements for water, sewage and other utility franchises. It does not set a new fee.

Steel pipes and equipment in front of the Deep Sky Alpha building under a blue sky.Energy Tech
Alberta · 2026-11-22

Ottawa opens a buying route for carbon removal from three Alberta projects

Canada opened federal purchasing to 19 carbon removal projects. Alberta’s Innisfail, Whitecourt and Vaulted Deep projects qualify under different pathways.

The red Hercules offshore drilling rig and support vessels in Bay Bulls harbour.Oil & Gas Tech
Canada · 2026-11-21

Bay du Nord has development approval. The $14-billion decision is still ahead

Bay du Nord has development-plan approval. Here’s what Equinor and Shell still have to decide, and which offshore jobs would stay in Newfoundland and Labrador.

Oil pumpjacks stand in a farm field near Falher, Alberta.Policy & Resources
Alberta · 2026-11-21

Alberta tightens the tax check for oil and gas licences

Alberta energy companies seeking certain licences or transfers face a $5,000 provincewide municipal tax arrears threshold under rules effective Nov. 3.

Flags flank the entrance to Edmonton City Hall’s council chamber.Policy & Resources
Alberta · 2026-11-21

More than 260 speakers sign up for Edmonton’s four-year budget hearing

Edmonton had 264 speakers registered by Nov. 20 for its 2027 to 2030 budget hearing. Here’s where to participate and what the draft would fund.

New Brunswick’s Legislative Assembly building in FrederictonPolicy & Resources
Canada · 2026-11-21

New Brunswick wants a say before utilities negotiate power for data centres

New Brunswick’s Bill 15 would require approval both before utilities study power deals for data centres and before contracts take effect. Expansions would also face review.

Downtown Fort McMurray from above, with streets, houses and the river valley.Policy & Resources
Alberta · 2026-11-21

Wood Buffalo proposes $38 million more for operations in 2027

Wood Buffalo proposes $556.6 million for operations and $130.2 million for capital in 2027. Here’s how the reserve transfer works and when residents can speak.

Timber ceiling and beams above the MacEwan LRT platform in Edmonton.Policy & Resources
Alberta · 2026-11-21

Alberta backs factory equipment for wood panels, trusses and millwork

Alberta announced $1.7 million for 13 wood manufacturing projects and extended the program through March 2028. The latest application window has closed.

Calgary’s sandstone City Hall beside the blue-glass Municipal Building, viewed from above.Policy & Resources
Alberta · 2026-11-21

Calgary’s water rates are set for January. Its infrastructure budget is still up for debate

Calgary’s budget hearings open Nov. 23. January water rates are already approved. Here’s what changes on a typical bill and what council can still decide.

Alberta · 2026-11-20 · Policy & Resources

Wood Buffalo proposes moving $4 million in Fort McMurray wastewater spending to later years

Wood Buffalo’s proposed 2027 budget shifts $4 million in Fort McMurray wastewater plant spending to 2028 and 2029 without changing the $11-million total.

Lattice transmission towers carry overhead power lines across rolling hills in southern Alberta.Energy Tech
Alberta · 2026-11-20

Alberta’s grid operator proposes lower demand rates as transmission costs rise

AESO’s 2027 tariff proposal would lower demand transmission rates on average as forecast costs rise. The filing’s percentage and dollar figures tell different stories.

Two Roam Transit buses with wildlife artwork travel through an intersection in Banff.Transportation
Alberta · 2026-11-20

Roam has stopped selling longer passes before its new fare system is ready

Roam has stopped selling three- and six-month unlimited passes through Token Transit. Its new system is not yet ready for riders in Banff and the Bow Valley.

A blue valve joins two pale-yellow pipes at the Shaganappi Pump Station construction site.Policy & Resources
Alberta · 2026-11-20

Calgary stays below its water-use limit as Bearspaw tie-ins continue

Calgary kept water demand below the 500-million-litre threshold while crews connected the replacement Bearspaw South Feeder Main. Stage 4 restrictions remain in effect.

Aerial view of winding waterways and wetlands near Fort Chipewyan.Policy & Resources
Alberta · 2026-11-20

A wireless project near Fort Chipewyan is operational. Who pays to keep remote internet running?

Ottawa lists a TELUS wireless project as operational near Fort Chipewyan. A CRTC consultation asks who should pay to keep Indigenous-led networks running.

Alberta · 2026-11-20 · Markets

Fuel sales led Alberta’s September retail gain

Alberta retail sales reached $9.9 billion in September. Gasoline and fuel vendors led the increase before the province suspended its fuel tax.

A blue-and-white Wood Buffalo transit bus travelling on Highway 63.Transportation
Alberta · 2026-11-20

Wood Buffalo’s buses already show up on your phone. What could a new transit system improve?

Wood Buffalo’s transit bid covers dispatch, tracking, schedules and onboard cameras. Bids are due Nov. 26, and riders already have real-time bus tracking.

An orange Neuron rental scooter with a helmet on its handlebar in Calgary.Transportation
Alberta · 2026-11-19

Alberta’s scooter rules and bike-lane powers collide in Bill 43

Proposed rules for private e-scooters arrive alongside provincial powers to remove bike lanes, with municipalities responsible for compliance costs.

Exterior of Google’s Platform 37 building in London beneath a clear blue sky.AI Related
Global · 2026-11-19

Google’s Gemini 4 Neon puts the cost of finishing work at the centre of the AI race

Gemini 4 Neon brings a million-token workspace and a business-focused pitch. Its model card also sets out limits that buyers should not overlook.

Archival aerial view of Fort McMurray with river channels, roads and downtown buildings.Startups
Alberta · 2026-11-18

Fort McMurray has a new front door for tech founders. What can they get at Keyano?

WBRIN’s new Keyano location connects Wood Buffalo innovators with advice and partners. Here is where to start and what support requires a separate application.

Colourful outdoor chairs and an Android statue outside a Google campus buildingAI Related
Canada · 2026-11-18

Google is rolling out Gemini Tasks for free in Canada. Which features are still U.S. first?

Google is releasing Gemini Tasks to free personal accounts in Canada. Here is what you can try and which texting, email and payment features are U.S. first.

Rows of server racks in a data centre hallMarkets
Canada · 2026-08-20

Hyperscaler spending keeps rising while its growth rate collapses, and that is the trade

The absolute number gets bigger every year, which is why the headlines stay bullish. The rate of change is falling hard, and for companies priced on acceleration those are two very different facts.

The Canada and United States border crossing at Fort Erie, OntarioPolicy & Resources
Canada · 2026-08-20

Washington’s 50 percent tariffs are live, and Canadian electronics are on the list

The tariffs that took effect this week were framed as a fight about cars, dairy and alcohol. The schedules attached to them reach a long way into Canadian technology hardware, and preferential trade status does not exempt anything.

Rows of densely cabled server racks inside a data centre hallAI Related
Alberta · 2026-08-15

Alberta’s power grid, not its politics, now sets the pace for AI data centres

Requests to connect AI data centres to Alberta’s grid outstrip what the system operator has been willing to release by more than fifteen to one. That ratio, not the announcements, is the real story.

The Walterdale Bridge over the North Saskatchewan River with the Edmonton skyline behind itAI Related
Alberta · 2026-08-13

Amii’s $50-million mandate shifts Alberta AI from research to adoption

Alberta’s AI institute has world-class reinforcement learning credentials. The new provincial investment is a bet that the bottleneck is now diffusion, not discovery.

Switchgear and a transformer inside an electrical substationCybersecurity
Canada · 2026-08-04

Canada’s cyber threat assessment points at the operators least able to defend themselves

The Cyber Centre's national assessment describes a threat landscape aimed at hospitals, municipalities and utilities. The organisations named are the ones with the smallest security budgets in the country.

NorthwardAB: Tech News, Alberta Focus

Technology news and market context with an Alberta-first lens and a Canada-wide view.

Coverage

Alberta technologyCanadian technologyStartup directoryInsights

Useful

Tech marketsFounder resourcesNews tipsRSS feed

Newsroom

About usEditorial standardsCorrectionsArchiveContact us
HomeNewsJobsMarketsResourcesAboutContact
© 2026 NorthwardAB.caMarket information is general information, not investment advice.
HomeNewsJobsMarketsResources